38
4. Maintenance Inspection
4.1 Inspection Items and Schedule
Follow the maintenance inspection schedule below.
It is assumed that the equipment is operating 8 hours per day.
If the equipment is running continuously night and day or otherwise running at a high operating
rate, inspect more often as needed.
�
External visual
inspection
Internal inspection Greasing
Start of work inspection
��
� �
After 1 month of operation
�
� �
After 6 months of operation
� ��
�
After 1 year of operation
� �� ��
Every 6 months thereafter
�
�
Every 1 year
� � ��
4.2 External Visual Inspection
An external visual inspection should check the following things.�
Main unit Loose actuator mounting bolts, other loose items
Cables Scratches, proper connections
Overall Irregular noise, vibration
�
4.3 Cleaning
� Clean the exterior as needed.
� Wipe off dirt with a soft cloth.
� Do not use strong compressed air on the actuator as this may force dust into the crevices.
� Do not use petroleum-based solvents on plastic parts or painted surfaces since such solvents
damage them.
� If the unit is badly soiled, apply a neutral detergent or alcohol to a soft cloth, and wipe gently.