Iai-america RCS2-A6R Manual de usuario Pagina 48

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 72
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 47
4. Maintenance Inspection
42
4.7 Reduction Belt
4.7.1 Inspection of the Belt
For inspection work, detach the cover of a pulley cover and carry it out visually.
The replacement period cannot be determined in general because the durability of the
deceleration belt can be greatly influenced by the conditions of operation.
It generally has life of hundreds of times for bending movement.
As a practical guideline, replace the reduction belt when any of the conditions listed below are
observed:
When remarkable abrasion is confirmed on the teeth or edges of the belt
When the belt is swelled for such reasons as oil being attached on
When damage is confirmed such as crack on the tooth or back of the belt
The belt has broken.
4.7.2 Applicable Belt
60S2M180R Rubber, cleanroom type (Bando Chemical Industries) 6mm wide
Vista de pagina 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53 ... 71 72

Comentarios a estos manuales

Sin comentarios